1st Floor, Lombard Suite. 28 Queen Street, London EC4R 1BB
0208 036 6199

New structured cabling installation in Berkshire

PTC has been appointed to undertake a large scale structured cabling installation at the technologies headquarters of a Worldwide Diamond Corporation in Berkshire.

This is the third project secured by PTC this year for this particular client.

PTC were involved with the planning of this complex phased installation to ensure live areas of the building encounter minimal disruption to their network connectivity during the construction period.

PTC_network-server-room-closeup

Leave a reply