1st Floor, Lombard Suite. 28 Queen Street, London EC4R 1BB
0208 036 6199

Another Structured Cabling project for PTC

PTC is due to commence work on site imminently with the supply and installation of a new Cat 5eE structured cabling system:

Project includes 20 pair CW1308 voice links and a new OM3 fibre backbone solution for a leading retail brand’s new warehouse facility in Stevenage.

Leave a reply